During 2014 - improving our simulator
For much of the year we were working on improving the simulator on the operating floor of the box which shows how the box worked before closure. The object of the exercise is to improve the reliabilty of the operation of the simulator. It not only involves a complete rewire of the system but new purpose-made interface circuit boards. All to be driven by a 'Raspberry Pi' computer.
The top photo on the right, taken in January, shows the initial stage where connector blocks have been mounted on the backboard supporting the track diagram, which has been made to swing out for easy access.
The bottom photo shows the stage reached in October when the new interface boards were being put in place and wired up to the connector blocks.
Other improvements include revisions to the way the lever positions are detected.
|